9,339
Data centers
18.13 GW
Reported · 622 data centers
313.14 GW
Pipeline MW
318.86 TWh
Est. energy / yr
111.2 Mt
Est. CO₂ / yr
154
Countries
expand_lessStatus
Operational8,222
Under construction343
Planned / permitted677
Cancelled / closed97
hollow = approximate location
my_location
fit_screen
layers
arrow_backAll countriesmapShow on map
publicData centers in Côte d'Ivoire
About these figures
Carbon intensity = LIFECYCLE gCO2e/kWh (Ember via Our World in Data), 2024. Renewable share = OWID/Ember; low-carbon (renewables+nuclear) and fossil shares computed from Ember 2024 TWh in OWID elec-mix-bar. Industrial price: Eurostat nrg_pc_205 2025-S2 (band ID 2-20 GWh, excl. VAT & recoverable taxes, EUR/kWh) for EU/EEA/candidates; otherwise GlobalPetrolPrices business rate (USD/kWh, 2023-2025 average) - not directly comparable. Water stress: WRI Aqueduct baseline water stress (country score/category as republished by WorldPopulationReview, WRI 2019 data; Aqueduct 4.0 file is a zip, not readable). WRI score not listed on WPR (category Low).
Data centers
5
Operators
5
Reported MW
3 MW
Pipeline MW
0 MW
Est. energy / yr
29.4 GWh
Est. CO₂ / yr
11.9 kt
Building area
3,415 m²
boltPower & water context
Grid carbon intensity
405.01 gCO₂e/kWh
Country 2024
Renewables in the grid
29%
Country 2024
Low-carbon share (RE + nuclear)
29%
Country 2024
Fossil share
71%
Country 2024
Industrial electricity price
0.23
Country 2023-2025 avg · USD/kWh (business rate, 2023-2025 average)
Water stress (WRI Aqueduct)
score: None · category: Low (<10%)
Country 2019 · WRI Aqueduct baseline water stress score 0-5
mapMap
corporate_fareLargest operators
by reported MWlocation_cityData centers by city
dnsData centers
5 · largest first| Data center | Status | Capacity | Building | PUE | Energy (est) | Networks |
|---|---|---|---|---|---|---|
| Raxio, CIV1, Abidjan, Côte d’Ivoire Zone Franche, VITIB,, BP 605 Grand Bassam, CI | Operational | 3 MW | 2,627 m² | 1.3 | 20.5 GWh | 0 |
| Equinix AB1 - Abidjan Grand Bassam, CI | Operational | — | 394 m² | 1.37 | 1.3 GWh | 10 |
| Datacenter service Abidjan CIV01 Grand Bassam, CI | Operational | — | 394 m² | — | 1.3 GWh | 1 |
| PAIX Abidjan Abidjan, CI | Operational | — | — | — | 6.3 GWh | 0 |
| DATACONNECT COTE D'IVOIRE · Abidjan Abidjan, CI | Operational | — | — | — | — | 0 |
RAXIO DATA CENTRES · Zone Franche, VITIB,, Côte d'Ivoire
Equinix AB1 - Abidjan
≈ 0.2 MW
Equinix · Grand Bassam, Côte d'Ivoire
Datacenter service Abidjan CIV01
≈ 0.2 MW
ST Digital · Grand Bassam, Côte d'Ivoire
PAIX Data Centres · Abidjan, Côte d'Ivoire
DATACONNECT COTE D'IVOIRE · Abidjan, Côte d'Ivoire