9,339
Data centers
18.13 GW
Reported · 622 data centers
313.14 GW
Pipeline MW
318.86 TWh
Est. energy / yr
111.2 Mt
Est. CO₂ / yr
154
Countries

expand_lessStatus

Operational8,222
Under construction343
Planned / permitted677
Cancelled / closed97
hollow = approximate location
my_location
fit_screen
layers
arrow_backAll countries

publicData centers in France

About these figures

Carbon intensity = LIFECYCLE gCO2e/kWh (Ember via Our World in Data), 2024. Renewable share = OWID/Ember; low-carbon (renewables+nuclear) and fossil shares computed from Ember 2024 TWh in OWID elec-mix-bar. Industrial price: Eurostat nrg_pc_205 2025-S2 (band ID 2-20 GWh, excl. VAT & recoverable taxes, EUR/kWh) for EU/EEA/candidates; otherwise GlobalPetrolPrices business rate (USD/kWh, 2023-2025 average) - not directly comparable. Water stress: WRI Aqueduct baseline water stress (country score/category as republished by WorldPopulationReview, WRI 2019 data; Aqueduct 4.0 file is a zip, not readable).

mapShow on map
Data centers
432
Operators
171
Reported MW
426 MW
Pipeline MW
180 MW
Est. energy / yr
9.82 TWh
Est. CO₂ / yr
397.4 kt
Building area
782,478 m²

boltPower & water context

Grid carbon intensity
40.48 gCO₂e/kWh
Country 2024
Renewables in the grid
27%
Country 2024
Low-carbon share (RE + nuclear)
95%
Country 2024
Fossil share
5.1%
Country 2024
Industrial electricity price
0.12
Country 2025-S2 · EUR/kWh (excl. VAT & recoverable taxes; band ID 2,000-19,999 MWh)
Water stress (WRI Aqueduct)
score: 1.92 · category: Low-Medium (10%-20%)
Country 2019 · WRI Aqueduct baseline water stress score 0-5
Data-center regulation
EU Energy Efficiency Directive (EU) 2023/1791 explicitly covers data centres (EU-wide DC energy-performance reporting, implemented via Delegated Regulation (EU) 2024/1364).
Country 2023
Data-center regulation
Industry self-regulation: Climate Neutral Data Centre Pact (PUE <1.3, or 1.4 warm climates, by 2030; new DCs from 2025; 75% clean energy by end-2025, 100% by 2030; WUE 0.4 L/kWh in water-stressed areas).
Country 2021
Data-center regulation
No French DC-specific statute verified beyond EU EED; public debate on a data-centre moratorium.
Country 2025

mapMap

location_cityMetro facts — moratoria, grid limits, heat reuse

location_onParis
unique facts
Equinix PA10 (Saint-Denis) recovers 6.6 MW of server heat into SMIREC/Plaine Commune Énergie network (Olympic Aquatics Centre, ZAC Plaine Saulnier), launched June 2024.
Country 2024
unique facts
Public debate in France over whether a moratorium on new data centres should be declared.
Country 2025

location_cityData centers by city

Paris31
Marseille12
Saint-Denis7
Vélizy-Villacoublay7
Nanterre6
La Courneuve5
Courbevoie5
Les Ulis4
Clichy4
Bordeaux4
Toulouse4
Cesson-Sévigné4
Villeurbanne4
Reims4
Grenoble4

dnsData centers

432 · largest first
Data centerStatusCapacityBuildingPUEEnergy (est)Networks
DATA4 Paris-Saclay Campus PAR01
Nozay, FR
Operational250 MW3,737 m²1.4325.6 GWh21
DATA4 PAR03 (Nozay, Route de Villejust)
Nozay, FR
Operational250 MW—1.43——
OVHcloud Gravelines
Gravelines, FR
Operational80 MW21,022 m²—78 GWh—
CDG1
FR
Operational74 MW23,341 m²—555.3 GWh—
Colt Paris 2 (Villebon-sur-Yvette)
Villebon-sur-Yvette, FR
Under construction40 MW————
Colt Paris 3 (Villebon-sur-Yvette)
Villebon-sur-Yvette, FR
Planned / permitted32 MW————
Colt Paris South West (Les Ulis)
Les Ulis, FR
Operational24 MW8,964 m²1.2151.4 GWh3
Global Switch Paris North
Clichy, Ile-de-France, FR
Operational24 MW——179.1 GWh—
Global Switch Paris South
Clichy, Ile-de-France, FR
Operational18 MW——134.3 GWh—
Global Switch Paris West
Clichy, Ile-de-France, FR
Operational17 MW——126.9 GWh—
Datacenter Martha
FR
Operational16 MW7,510 m²—117.1 GWh—
Colt Paris 4 (Villebon-sur-Yvette)
Villebon-sur-Yvette, FR
Planned / permitted9.6 MW————
nLighten Sophia Antipolis NCE1
Antibes, FR
Operational6 MW1,843 m²1.2940.7 GWh14
DATA4 Paris Marcoussis PAR2
Marcoussis, Essonne, FR
Operational5 MW2,614 m²1.4337.7 GWh3
CyrusOne Paris PAR1
Wissous, FR
Operational4.5 MW—1.4634.5 GWh—
nLighten Paris PAR1
Lognes, FR
Operational2.4 MW2,085 m²1.2916.3 GWh2
nLighten Besancon MLH1
Besançon, FR
Operational1.2 MW1,692 m²1.298.1 GWh14
Equinix PA3 - Paris, Saint-Denis
Saint-Denis, FR
Operational—20,982 m²1.37186.8 GWh128
Reliance St. Denis
Paris, FR
Operational—20,982 m²—142.5 GWh0
OPCORE DC6-5
FR
Operational—13,707 m²1.3789.8 GWh—
Digital Realty Paris PAR2
Aubervilliers, FR
Operational—13,706 m²1.3836 GWh54
Greenfield
FR
Operational—13,199 m²—89.6 GWh—
BNP Paribas Centre de Traitement Informatique (CTI) Marne Nord
FR
Operational—13,149 m²—89.3 GWh—
Greenfield
FR
Operational—13,083 m²—88.9 GWh—
Datacenter Vega
FR
Operational—12,318 m²—83.7 GWh—
EXA Edge DC Nancy
Nancy, FR
Operational—12,110 m²—82.2 GWh1
Datacenter Banque de France
FR
Operational—12,042 m²—81.8 GWh—
Smartdc Paris
Montreuil, FR
Operational—12,002 m²—81.5 GWh1
Datacenter Sirius
FR
Operational—11,585 m²—78.7 GWh—
OPCORE - DC3 / PAR3
Vitry-sur-Seine, Val-de-Marne, FR
Operational—9,892 m²1.36120.8 GWh27
Airbus data center (France)
FR
Operational—8,690 m²—59 GWh—
Orange - Aubervilliers
FR
Operational—7,652 m²—52 GWh—
Equinix PA6 - Paris, Condorcet
Paris, FR
Operational—7,460 m²1.3778.9 GWh64
OPCORE - DC5 / PAR5
Saint-Ouen-l'Aumône, Val-d'Oise, FR
Operational—7,451 m²1.18209.6 GWh5
UltraEdge Strasbourg
Strasbourg, FR
Operational—7,428 m²—25.2 GWh42
Extendo Datacenter Belfort
Belfort, FR
Operational—7,355 m²—28 GWh1
Aqua Ray Aurora
Ivry-sur-Seine, Île-de-France, FR
Operational—7,067 m²—48 GWh3
Digital Realty Paris PAR12
Ferrières-en-Brie, FR
Operational—7,012 m²1.3858.1 GWh1
Cogent data center (Rennes)
Rennes, FR
Operational—6,983 m²—47.4 GWh26
Digital Realty Paris PAR8
La Courneuve, FR
Operational—6,915 m²1.38173.1 GWh6
Albiréo
FR
Operational—6,666 m²—45.3 GWh—
OPCORE DC1
FR
Operational—6,540 m²1.4857 GWh—
Equinix BX1 - Bordeaux
Bruges, Bordeaux, FR
Operational—6,274 m²1.378.2 GWh9
Hexatom Sophia Antipolis
Nice, FR
Operational—6,237 m²—42.4 GWh1
La Pointe 1
Noyelles-lès-Seclin, FR
Operational—6,178 m²—42 GWh—
Albiréo
FR
Operational—5,811 m²—39.5 GWh—
Equinix PA13X
FR
Operational—5,691 m²1.37149.2 GWh—
Euroclear
FR
Operational—5,519 m²—37.5 GWh—
Datacenter Société Generale
FR
Operational—5,407 m²—36.7 GWh—
Datacenter BNP Paribas Marne Est 2
FR
Operational—5,349 m²—109 GWh—
Bouygues Telecom Montigny-le-Bretonneux
Montigny le Bretonneux, FR
Operational—5,289 m²—35.9 GWh—
Datacenter Bouygues Télécom
FR
Operational—5,207 m²—35.4 GWh—
Datacenter MGEN
FR
Operational—5,133 m²—34.9 GWh—
Digital Realty Marseille MRS1
Marseille, FR
Operational—5,128 m²1.3891.4 GWh224
Global Switch Paris
Clichy, FR
Operational—4,782 m²—32.5 GWh31
Penta Infra Paris PAR01
Lognes, Seine-et-Marne, FR
Operational—4,767 m²—16.2 GWh12
Sungard AS IT
Lognes, FR
Operational—4,767 m²—32.4 GWh—
EDF data center (France)
FR
Operational—4,538 m²—30.8 GWh—
Digital Realty Paris PAR7
La Courneuve, FR
Operational—4,492 m²1.38116.2 GWh19
Lille Boitelle
FR
Operational—4,491 m²—30.5 GWh—
FDJ data center (France)
FR
Operational—4,476 m²—30.4 GWh—
Free Pro - Datacenter Marseille (MAR02)
FR
Operational—4,447 m²—15.1 GWh—
Telehouse Marseille THM1
Marseille, FR
Operational—4,447 m²—15.1 GWh—
Allianz data center (France)
FR
Operational—4,433 m²—30.1 GWh—
Digital Realty MRS2
Marseille, FR
Operational—4,371 m²1.3873.3 GWh—
D-LAKE · Annecy
Annecy, Auvergne-Rhône-Alpes, FR
Operational—4,340 m²—117.9 GWh3
Datacenter SNCF RESARAIL
FR
Operational—4,292 m²—29.1 GWh—
Datacenter Banque de France
FR
Operational—4,218 m²—28.6 GWh—
Cogent Poitiers
Poitiers, FR
Operational—4,124 m²—28 GWh10
Datacenter Groupama
FR
Operational—4,100 m²—27.8 GWh—
Cogent Bordeaux
Bordeaux, FR
Operational—3,921 m²—106.5 GWh11
ANSSI data center (France)
FR
Operational—3,867 m²—26.3 GWh—
SFR Netcenter Bordeaux
Bordeaux, FR
Operational—3,849 m²—52.3 GWh—
Equinix PA10 - Paris, Saint-Denis
Saint-Denis, Seine-Saint-Denis, FR
Operational—3,832 m²1.3791.9 GWh18
REDHEBERG SAS · Paris
Paris, FR
Operational—3,755 m²—6.3 GWh0
TAS Sophia
Antibes, FR
Operational—3,700 m²—100.5 GWh1
SFR Netcenter Vénissieux
FR
Operational—3,691 m²—25.1 GWh—
Equinix PA2 - Paris, Saint-Denis
Saint-Denis, FR
Operational—3,675 m²1.37124.3 GWh151
Datacenter IBM
FR
Operational—3,612 m²—24.5 GWh—
BNP Paribas Marne Sud
FR
Operational—3,578 m²—24.3 GWh—
Datacenter IBM · Seclin
Seclin, FR
Operational—3,573 m²—24.3 GWh—
IFP data center (France)
FR
Operational—3,484 m²—23.7 GWh—
Eurofiber DC - TLS00
Toulouse, FR
Operational—3,468 m²—23.6 GWh25
Oscar
FR
Operational—3,367 m²—22.9 GWh—
Datacenter Completel
FR
Operational—3,366 m²—22.9 GWh—
Datacenter
FR
Operational—3,245 m²—22 GWh—
Celeste Fil d’Ariane
Albi, OCCITANIE, FR
Operational—3,217 m²—21.8 GWh2
Datacenter RTE
FR
Operational—3,179 m²—64.8 GWh—
MEDIACTIVE MN3
Choisy-le-Roi, IDF, FR
Operational—3,152 m²—21.4 GWh3
Datacenter BNP
FR
Operational—3,109 m²—21.1 GWh—
Digital Realty Paris PAR3
Saint-Denis, FR
Operational—3,095 m²1.3828.1 GWh19
Datacenter IBM
FR
Operational—2,953 m²—20.1 GWh—
Datacenter IBM - Grabels
FR
Operational—2,951 m²—20 GWh—
Cogent Nice
Nice, FR
Operational—2,891 m²—19.6 GWh7
NetaPOP Pontarlier
Pontarlier, FR
Operational—2,865 m²—19.5 GWh1
dc2scale Nanterre
Nanterre, Ile de France, FR
Operational—2,828 m²—76.8 GWh0
dc2scale LIL1 (Lille Datacenter)
Mons en Baroeul, FR
Operational—2,826 m²—19.2 GWh2
OPCORE - DC2 / PAR2
Vitry-sur-Seine, Val-de-Marne, FR
Operational—2,824 m²1.4747.8 GWh44
Alpes Networks DataCenter · Chavanod
Chavanod, Annecy, FR
Operational—2,569 m²—17.4 GWh1
OVHcloud Roubaix - RBX1
FR
Operational—2,569 m²—17.4 GWh—
UltraEdge Rennes
Cesson-Sévigné, FR
Operational—2,552 m²—17.3 GWh9
UltraEdge Lille
Lille, FR
Operational—2,538 m²—17.2 GWh2
Datagrex · Saint-Saturnin
Saint-Saturnin, Puy-de-Dôme, FR
Operational—2,486 m²—16.9 GWh2
Marseille St-Mauront
FR
Operational—2,467 m²—16.8 GWh—
ETIX Nantes #3
Couëron, Nantes, FR
Operational—2,443 m²—16.6 GWh10
Datacenter Orange
FR
Operational—2,436 m²—66.2 GWh—
France Travail datacenter Orléans
FR
Operational—2,433 m²—16.5 GWh—
Datacenter Atos
FR
Operational—2,381 m²—16.2 GWh—
SM4
FR
Operational—2,323 m²—15.8 GWh—
Worldline Dassault
FR
Operational—2,322 m²—15.8 GWh—
nLighten Paris PAR2
Aubervilliers, FR
Operational—2,317 m²—7.9 GWh10
GTT data center (France)
FR
Operational—2,317 m²—7.9 GWh—
ITinSell Cloud Datacenter · La Ciotat
La Ciotat, Bouches-du-Rhône, FR
Operational—2,309 m²—15.7 GWh3
Cogent Dijon
Dijon, FR
Operational—2,304 m²—15.6 GWh10
SFR
FR
Operational—2,197 m²—29.8 GWh—
Comarch France #1
Lezennes, Nord, FR
Operational—2,180 m²—14.8 GWh3
Salle technique Eurosport
FR
Operational—2,159 m²—6.3 GWh—
EXA Edge DC Toulouse
Toulouse, Toulouse, FR
Operational—2,139 m²—14.5 GWh0
SNCF data center (France)
FR
Operational—2,121 m²—14.4 GWh—
Datacenter Groupe Casino
FR
Operational—2,061 m²—14 GWh—
B4
FR
Operational—2,053 m²—13.9 GWh—
Reliance Plerin
Plérin, Saint-Brieuc, FR
Operational—2,005 m²—40.9 GWh0
LIFO
FR
Operational—1,977 m²—26.9 GWh—
Equinix PA7 - Paris, Energy Park
Courbevoie, FR
Operational—1,962 m²1.3745.3 GWh54
ETIX Lille #2
Sainghin-en-Mélantois, FR
Operational—1,916 m²—13 GWh48
SFR
FR
Operational—1,896 m²—12.9 GWh—
CC IN2P3
Villeurbanne, FR
Operational—1,867 m²—38 GWh11
Datacenter des Douanes
FR
Operational—1,849 m²—12.6 GWh—
SFR data center (France)
FR
Operational—1,843 m²—12.5 GWh—
Euroclear data center (France)
FR
Operational—1,816 m²—12.3 GWh—
Salle technique Euronews
FR
Operational—1,806 m²—49.1 GWh—
ETIX Nantes #2
Carquefou, FR
Operational—1,802 m²—6.1 GWh11
Completel Val de Reuil
Paris, FR
Operational—1,802 m²—6.3 GWh2
Sigma DC3
Carquefou, Pays de la Loire, FR
Operational—1,802 m²—6.1 GWh0
Cogent Velizy
Vélizy-Villacoublay, FR
Operational—1,791 m²—36.5 GWh9
Datacenter IBM
FR
Operational—1,763 m²—12 GWh—
Neuf Reims
Reims, FR
Operational—1,749 m²—11.9 GWh1
Cogent Nantes
Nantes, FR
Operational—1,739 m²—47.2 GWh16
ETIX Lille #3
Anzin - Valenciennes, Nord, FR
Operational—1,738 m²—11.8 GWh20
O2Switch DC2
FR
Operational—1,720 m²—11.7 GWh—
OpenStreetMap France data center (France)
FR
Operational—1,669 m²—11.3 GWh—
Nation Data Center Rennes
FR
Operational—1,666 m²—11.3 GWh—
Cogent Grenoble
Grenoble, FR
Operational—1,665 m²—22.6 GWh21
Datacenter RTE
FR
Operational—1,664 m²—45.2 GWh—
Free Pro - Marseille - MRS1
Marseille, FR
Operational—1,654 m²—11.2 GWh28
Datacenter Groupama
FR
Operational—1,632 m²—11.1 GWh—
DC Free
FR
Operational—1,627 m²—11.1 GWh—
Alionis VBO
Villebon-sur-Yvette, FR
Operational—1,591 m²—21.6 GWh0
Thésée DataCenter
FR
Operational—1,514 m²—10.3 GWh—
TDF Datacenter Bordeaux Bouliac
Bouliac, FR
Operational—1,490 m²—10.1 GWh7
dc2scale PAR2 (Vélizy-Villacoublay)
Vélizy-Villacoublay, FR
Operational—1,487 m²—5 GWh21
Dyjix · Vélizy-Villacoublay
Vélizy-Villacoublay, FR
Operational—1,487 m²—5 GWh5
RATP data center (France)
FR
Operational—1,474 m²—10 GWh—
Interoute Marseille
FR
Operational—1,461 m²—9.9 GWh—
Data Center Bluecom
FR
Operational—1,438 m²—9.8 GWh—
Fiducial Cloud LYO1
Lyon, Auvergne-Rhône-Alpes, FR
Operational—1,403 m²—38.1 GWh1
Paris St Amand
FR
Operational—1,398 m²—38 GWh—
ETIX Paris #1
Paris, Paris, FR
Operational—1,391 m²—4.7 GWh6
NeoCenter Paris
Paris, FR
Operational—1,391 m²—4.7 GWh0
SFR data center (France)
FR
Operational—1,388 m²—9.4 GWh—
Free Pro - Limonest
Limonest, FR
Operational—1,306 m²—8.9 GWh17
Centre Régional de Ressources Informatiques (CRRI)
FR
Operational—1,305 m²—8.9 GWh—
Free Pro - Lyon - Rock
Lyon, FR
Operational—1,301 m²—26.5 GWh23
Castle-IT Tours
Larcay, FR
Operational—1,301 m²—8.8 GWh1
nLighten Paris PAR3
Paris, FR
Operational—1,264 m²—4.3 GWh0
Datacenter Oxya
FR
Operational—1,264 m²—4.3 GWh—
Centre de données MAIF
FR
Operational—1,257 m²—8.5 GWh—
nLighten Strasbourg SXB1
Illkirch-Graffenstaden, FR
Operational—1,248 m²—17 GWh8
nLighten Lyon LYS1
Villeurbanne, Rhône, FR
Operational—1,247 m²—8.5 GWh21
ETIX Lille #1
Tourcoing, Lille, FR
Operational—1,245 m²—8.5 GWh15
Datacenter France Travail
FR
Operational—1,233 m²—8.4 GWh—
SFR data center (France)
FR
Operational—1,197 m²—8.1 GWh—
OPCORE - DC4 / PAR4
Paris, Paris, FR
Operational—1,169 m²1.3730.6 GWh1
TDF Datacenter Paris Fort de Romainville
Les Lilas, FR
Operational—1,167 m²—7.9 GWh2
Datacenter Orange Archives
FR
Operational—1,150 m²—7.8 GWh—
Salle Technique TV5MONDE
FR
Operational—1,145 m²—7.8 GWh—
Sartera
FR
Operational—1,118 m²—7.6 GWh—
Bouygues Télécom data center (France)
FR
Operational—1,093 m²—7.4 GWh—
SFR data center (France)
FR
Operational—1,083 m²—14.7 GWh—
Datacenter RTE
FR
Operational—1,055 m²—7.2 GWh—
Zayo Velizy
FR
Operational—1,055 m²—7.2 GWh—
EXA Edge DC Sequedin
Sequedin, Lille, FR
Operational—1,052 m²—7.1 GWh1
Digital Realty Paris PAR6
Ivry-sur-Seine, FR
Operational—1,040 m²1.386.9 GWh13
Datacenter Bouygues Télécom
FR
Operational—1,039 m²—7.1 GWh—
Datacenter Sud
FR
Operational—1,031 m²—7 GWh—
ETIX Nantes #1
Saint-Herblain, Nantes, FR
Operational—1,014 m²—10.3 GWh22
OT - Armor
Saint-Herblain, Loire Atlantique, FR
Operational—1,014 m²—10.3 GWh1
Groupe Cyllene - DC - Montigny les Bretonneux
Montigny-le-Bretonneux, Versailles, FR
Operational—1,009 m²—6.9 GWh2
Telehouse - Paris 1 (Jeûneurs)
Paris, FR
Operational—1,000 m²—27.2 GWh18
DC Moeskroen
FR
Operational—1,000 m²—6.8 GWh—
Bouygues Télécom data center (France)
FR
Operational—997 m²—6.8 GWh—
Bouygues Télécom data center (France)
FR
Operational—987 m²—6.7 GWh—
Bouygues Télécom data center (France)
FR
Operational—973 m²—6.6 GWh—
SostraData
FR
Operational—964 m²—6.5 GWh—
Salle Technique France Télévisions
FR
Operational—948 m²—25.8 GWh—
ATE #1 · Villeneuve d'Ascq
Villeneuve d'Ascq, Nord, FR
Operational—943 m²—6.4 GWh0
Bouygues Télécom data center (France)
FR
Operational—927 m²—6.3 GWh—
Bouygues Télécom data center (France)
FR
Operational—921 m²—6.3 GWh—
Datacenter IBO
FR
Operational—920 m²—6.2 GWh—
Salamandre
Paris, Paris, FR
Operational—917 m²—24.9 GWh3
Data4 · Nozay, France
Operational · Colocation · 3,737 m² · 21 networks
Data4 · Nozay, France
Operational · Colocation · PUE 1.43
OVHcloud · Gravelines, France
Operational · Colocation · 21,022 m²
CDG1
74 MW
CloudHQ, LLC · France
Operational · Colocation · 23,341 m² · opened 2025
Colt · Villebon-sur-Yvette, France
Under construction · Colocation
Colt · Villebon-sur-Yvette, France
Planned / permitted · Colocation
Colt · Les Ulis, France
Operational · Colocation · 8,964 m² · 3 networks
Global Switch · Clichy, France
Operational · Colocation
Global Switch · Clichy, France
Operational · Colocation
Global Switch · Clichy, France
Operational · Colocation
digitalrealty · France
Operational · Enterprise · 7,510 m² · opened 2020
Colt · Villebon-sur-Yvette, France
Planned / permitted · Colocation
nLighten · Antibes, France
Operational · Colocation · 1,843 m² · 14 networks
Data4 · Marcoussis, France
Operational · Colocation · 2,614 m² · 3 networks
CyrusOne · Wissous, France
Operational · Colocation · PUE 1.46
nLighten · Lognes, France
Operational · Colocation · 2,085 m² · 2 networks
nLighten · Besançon, France
Operational · Colocation · 1,692 m² · 14 networks
Equinix · Saint-Denis, France
Operational · Colocation · 20,982 m² · 128 networks
FLAG Telecom · Paris, France
Operational · Colocation · 20,982 m²
OPCORE DC6-5
≈ 12 MW
OPCORE (Scaleway/iliad) · France
Operational · Colocation · 13,707 m² · PUE 1.37
Digital Realty · Aubervilliers, France
Operational · Colocation · 13,706 m² · 54 networks
Greenfield
≈ 12 MW
Crédit Agricole · France
Operational · Colocation · 13,199 m²
BNP Paribas · France
Operational · Colocation · 13,149 m²
Greenfield
≈ 12 MW
Crédit Agricole · France
Operational · Colocation · 13,083 m²
Natixis · France
Operational · Colocation · 12,318 m²
EXA Infrastructure · Nancy, France
Operational · Colocation · 12,110 m² · 1 networks
Banque de France · France
Operational · Colocation · 12,042 m²
Smartdc Paris
≈ 11 MW
Smartdc · Montreuil, France
Operational · Colocation · 12,002 m² · 1 networks
Natixis · France
Operational · Colocation · 11,585 m²
OPCORE (Scaleway/iliad) · Vitry-sur-Seine, France
Operational · Colocation · 9,892 m² · 27 networks
Airbus · France
Operational · Colocation · 8,690 m²
Orange (Orange Business data centers) · France
Operational · Colocation · 7,652 m²
Equinix · Paris, France
Operational · Colocation · 7,460 m² · 64 networks
OPCORE (Scaleway/iliad) · Saint-Ouen-l'Aumône, France
Operational · Colocation · 7,451 m² · 5 networks
UltraEdge · Strasbourg, France
Operational · Colocation · 7,428 m² · 42 networks
Extendo Datacenter · Belfort, France
Operational · Colocation · 7,355 m² · 1 networks
Aqua Ray Aurora
≈ 6.4 MW
Aqua Ray · Ivry-sur-Seine, France
Operational · Colocation · 7,067 m² · 3 networks
Digital Realty · Ferrières-en-Brie, France
Operational · Colocation · 7,012 m² · 1 networks
Cogent Communications · Rennes, France
Operational · Colocation · 6,983 m² · 26 networks
Digital Realty · La Courneuve, France
Operational · Enterprise · 6,915 m² · 6 networks
Albiréo
≈ 6.1 MW
Albiant IT · France
Operational · Colocation · 6,666 m²
OPCORE DC1
≈ 7.3 MW
OPCORE (Scaleway/iliad) · France
Operational · Colocation · 6,540 m² · PUE 1.48
Equinix · Bruges, France
Operational · Colocation · 6,274 m² · 9 networks
Hexatom S.A.R.L. · Nice, France
Operational · Colocation · 6,237 m² · 1 networks
La Pointe 1
≈ 5.6 MW
Worldline · Noyelles-lès-Seclin, France
Operational · Colocation · 6,178 m²
Albiréo
≈ 5.3 MW
Albiant IT · France
Operational · Colocation · 5,811 m²
Equinix PA13X
≈ 21 MW
Equinix · France
Operational · Colocation · 5,691 m² · PUE 1.37
Euroclear
≈ 5 MW
Euroclear · France
Operational · Colocation · 5,519 m²
Société Generale · France
Operational · Colocation · 5,407 m²
BNP Paribas · France
Operational · Colocation · 5,349 m²
Bouygues Télécom · Montigny le Bretonneux, France
Operational · Colocation · 5,289 m²
Bouygues Télécom · France
Operational · Colocation · 5,207 m²
Datacenter MGEN
≈ 4.7 MW
MGEN · France
Operational · Colocation · 5,133 m²
Digital Realty · Marseille, France
Operational · Colocation · 5,128 m² · 224 networks
Global Switch · Clichy, France
Operational · Colocation · 4,782 m² · 31 networks
Penta Infra · Lognes, France
Operational · Colocation · 4,767 m² · 12 networks
Sungard AS IT
≈ 4.3 MW
Sungard AS · Lognes, France
Operational · Colocation · 4,767 m²
EDF · France
Operational · Colocation · 4,538 m²
Digital Realty · La Courneuve, France
Operational · Colocation · 4,492 m² · 19 networks
Lille Boitelle
≈ 4.1 MW
Orange (Orange Business data centers) · France
Operational · Colocation · 4,491 m²
1–200 of 432