9,339
Data centers
18.13 GW
Reported · 622 data centers
313.14 GW
Pipeline MW
318.86 TWh
Est. energy / yr
111.2 Mt
Est. CO₂ / yr
154
Countries
expand_lessStatus
Operational8,222
Under construction343
Planned / permitted677
Cancelled / closed97
hollow = approximate location
my_location
fit_screen
layers
arrow_backAll operators
corporate_fare
AirTrunk data centers
Blackstone-led consortium (with CPP Investments) · private (Blackstone and CPP Investments)
Data centers
22
Countries
6
Reported MW
613 MW
Pipeline MW
1.73 GW
Building area
51,593 m²
Est. energy / yr
4.09 TWh
Est. CO₂ / yr
2.1 Mt
Median PUE
1.32
ecoSustainability — operator-wide
Hover a value for the quote from the reportboltEnergy
Renewable share
72%
Operator-wide 2025 · electricity consumption matched with renewable energy, FY25
Renewable procurement
Solar PPAs (over 255MW under construction in Australia, incl. Mulwala Solar Farm with Google/European Energy), rooftop solar at JHB1 and SYD1, Hong Kong landfill-gas RECs, Malaysia CGPP VPPA (29.99 MWac solar with ib vogt — Malaysia's first DC renewable VPPA, 2026)
Operator-wide 2026 · company
PPAs contracted
255 MW
Operator-wide 2025 · two solar projects under construction (Australia); excludes 29.99 MWac Malaysia VPPA
Average PUE
1.32 ratio
Operator-wide 2025 · portfolio average annual operating PUE FY25
Design PUE, new builds
1.37 ratio
Operator-wide 2026 · JHB2 Johor (tropical); long-term target band 1.23-1.28
cloudEmissions
Scope 1
6 ktCO₂e
Operator-wide 2025 · FY25 diesel + refrigerant
Scope 2 location-based
319.3 ktCO₂e
Operator-wide 2025 · FY25
Scope 2 market-based
319.1 ktCO₂e
Operator-wide 2025 · FY25 (as extracted; near-identical to location-based — verify)
Scope 3
1.15 MtCO₂e
Operator-wide 2025 · sum of three main categories: capital goods 437,347 + fuel/energy 193,777 + customer electricity (location-based) 522,452
Carbon intensity
0.23 CUE (kgCO2e/kWh IT)
Operator-wide 2025 · portfolio annual operating CUE; embodied carbon ratio 2.48 tCO2e/kW IT
water_dropWater
WUE
0.89 L/kWh
Operator-wide 2025 · portfolio FY25 (net of recycled water 0.40 L/kWh)
Water target
Minimise water withdrawal and pursue alternative sources in water-stressed regions; 55% of FY25 water use from recycled supply
Operator-wide 2025 · company
recyclingWaste
Waste diverted from landfill
73%
Operator-wide 2025 · FY25
Zero-waste sites
50% of data centres certified Zero Waste (UL 2799)
Operator-wide 2025 · operational DCs
flagTargets & commitments
Net-zero target
2030
Operator-wide 2025 · Scope 1 and 2
Renewable target
100% renewable energy matching at all sites by 2030
Operator-wide 2025 · platform
RE100 member
yes
Operator-wide 2025 · company (also UNGC, TCFD supporter, 24/7 Carbon-Free Energy Compact founding partner)
ISO 14001
100% of operational data centres ISO 14001 (also ISO 45001, ISO 9001)
Operator-wide 2025 · operational DCs
Green bonds
Over A$17.75bn ESG-linked financing (FY25); plus US$2.325bn (RM9.5bn) green project financing for JHB2 Malaysia (Jul 2026)
Operator-wide 2026 · company
business_centerBusiness
Data centers
8 count
Operator-wide 2025 · operational at 30 June 2025 (SYD3, SGP2, HKG2, OSK1, JHB2 under development)
Pipeline capacity
1.9 GW
Operator-wide 2025 · total platform capacity incl. development (1.9 GW at 30 June 2025); operational MW not separated
Countries
7 count
Operator-wide 2026 · Australia, Hong Kong, India, Japan, Malaysia, Saudi Arabia, Singapore (India and Saudi Arabia new in 2026)
Employees
502 count
Operator-wide 2025 · at 30 June 2025
Headquarters
Australia
Operator-wide 2025 · Sydney-founded 2015
campaignNotable
Notable facts
GRESB 5-star (98/100); plans US$30bn and 5GW+ investment in India (Jun 2026); Malaysia platform expanded to 700MW+ with two new Johor campuses; Mulwala Solar Farm with Google and European Energy; cryogenic data centre R&D with Emergence Quantum (Sep 2026); margin savings from sustainability-linked loans fund community partnerships
Operator-wide 2026 · company
mapFootprint
publicData centers by country
dnsData centers
22 · largest first| Data center | Status | Capacity | Building | PUE | Energy (est) | Networks |
|---|---|---|---|---|---|---|
| AirTrunk SYD3 Sydney West Huntingwood, NSW, AU | Operational | 400 MW | — | 1.32 | — | — |
| AirTrunk MEL2 Melbourne Tullamarine, VIC, AU | Under construction | 354 MW | — | 1.32 | — | — |
| AirTrunk TOK1 Tokyo East Inzai, Chiba, JP | Operational | 300 MW | — | 1.32 | — | — |
| AirTrunk JHB2 Johor Iskandar Puteri, Johor, MY | Under construction | 270 MW | — | 1.32 | — | — |
| AirTrunk HYD1 Hyderabad Chandanvelly, Telangana, IN | Planned / permitted | 243 MW | — | 1.32 | — | — |
| AirTrunk MEL1 Derrimut, VIC, AU | Operational | 185 MW | 8,435 m² | 1.15 | 1.12 TWh | 1 |
| AirTrunk JHB1 Johor Johor Bahru, Johor, MY | Operational | 150 MW | — | 1.32 | — | — |
| AirTrunk JHB4 Johor Bahru Johor Bahru, Johor, MY | Planned / permitted | 142 MW | — | 1.32 | — | — |
| AirTrunk JHB3 Johor Bahru Johor Bahru, Johor, MY | Planned / permitted | 138 MW | — | 1.32 | — | — |
| AirTrunk SYD1 Huntingwood, NSW, AU | Operational | 130 MW | 16,099 m² | 1.15 | 785.8 GWh | 4 |
| AirTrunk MAA1 Chennai Chennai (Ambattur), Tamil Nadu, IN | Planned / permitted | 128 MW | — | 1.32 | — | — |
| AirTrunk SYD2 Sydney North Lane Cove West, NSW, AU | Operational | 120 MW | 13,891 m² | 1.15 | 725.3 GWh | — |
| AirTrunk BOM2 Mumbai Navi Mumbai (Mahape), Maharashtra, IN | Under construction | 120 MW | — | 1.32 | — | — |
| AirTrunk OSK2 Osaka Downtown East Osaka (east), Osaka, JP | Planned / permitted | 100 MW | — | 1.32 | — | — |
| AirTrunk SGP1 Singapore, Singapore, SG | Operational | 78 MW | 4,241 m² | 1.25 | 512.5 GWh | 1 |
| AirTrunk SGP2 Singapore Loyang, SG | Under construction | 70 MW | — | 1.32 | — | — |
| AirTrunk BOM1 Mumbai Navi Mumbai (Airoli), Maharashtra, IN | Under construction | 62 MW | — | 1.32 | — | — |
| AirTrunk TOK2 Tokyo West Ome, Tokyo, JP | Operational | 60 MW | 6,508 m² | 1.15 | 664.9 GWh | — |
| AirTrunk BOM3 Mumbai Mumbai (Chandivali), Maharashtra, IN | Under construction | 48 MW | — | 1.32 | — | — |
| AirTrunk HKG1 Hong Kong, Hong Kong, HK | Operational | 20 MW | 2,419 m² | 1.35 | 141.9 GWh | 0 |
| AirTrunk OSK1 Osaka West Amagasaki, Hyogo, JP | Operational | 20 MW | — | 1.32 | 138.8 GWh | — |
| AirTrunk HKG2 Hong Kong Hong Kong (East New Territories), HK | Operational | 15 MW | — | 1.32 | — | — |
AirTrunk · Huntingwood, Australia
AirTrunk MEL2 Melbourne
354 MW
AirTrunk · Tullamarine, Australia
AirTrunk TOK1 Tokyo East
300 MW
AirTrunk · Inzai, Japan
AirTrunk JHB2 Johor
270 MW
AirTrunk · Iskandar Puteri, Malaysia
AirTrunk HYD1 Hyderabad
243 MW
AirTrunk · Chandanvelly, India
AirTrunk MEL1
185 MW
AirTrunk · Derrimut, Australia
AirTrunk JHB1 Johor
150 MW
AirTrunk · Johor Bahru, Malaysia
AirTrunk · Johor Bahru, Malaysia
AirTrunk · Johor Bahru, Malaysia
AirTrunk SYD1
130 MW
AirTrunk · Huntingwood, Australia
AirTrunk MAA1 Chennai
128 MW
AirTrunk · Chennai (Ambattur), India
AirTrunk · Lane Cove West, Australia
AirTrunk BOM2 Mumbai
120 MW
AirTrunk · Navi Mumbai (Mahape), India
AirTrunk · Osaka (east), Japan
AirTrunk SGP1
78 MW
AirTrunk · Singapore, Singapore
AirTrunk · Loyang, Singapore
AirTrunk BOM1 Mumbai
62 MW
AirTrunk · Navi Mumbai (Airoli), India
AirTrunk · Ome, Japan
AirTrunk BOM3 Mumbai
48 MW
AirTrunk · Mumbai (Chandivali), India
AirTrunk HKG1
20 MW
AirTrunk · Hong Kong, Hong Kong
AirTrunk · Amagasaki, Japan
AirTrunk · Hong Kong (East New Territories), Hong Kong