Global Switch data centers
Elegant Jubilee Limited (51%), Strategic IDC Limited (24.99%), Tough Expert Limited (24.01%); controlling shareholder Jiangsu Shagang Group · private (Chinese-controlled; Jiangsu Shagang Group controlling shareholder); bonds listed on Euronext
Data centers
17
Countries
9
Reported MW
442 MW
Pipeline MW
0 MW
Building area
62,675 m²
Est. energy / yr
3.6 TWh
Est. CO₂ / yr
663.4 kt
Median PUE
1.2
ecoSustainability — operator-wide
Hover a value for the quote from the reportboltEnergy
Renewable share
88%
Operator-wide 2025 · renewables-backed electricity procured globally (100% in Europe and Singapore); annual report states 88.0%
Average PUE
8% year-on-year improvement of group-wide operational average PUE (absolute value not extracted)
Operator-wide 2025 · group operational average
Design PUE, new builds
annualised PUE <1.2 in Europe and <1.4 in Asia-Pacific for new developments
Operator-wide 2025 · new developments
cloudEmissions
Scope 2 market-based
Scope 1+2 combined market-based: 71,227 tCO2e (2023 baseline 48,533; 2030 target 28,149)
Operator-wide 2025 · group
Scope 3
35.7 ktCO₂e
Operator-wide 2025 · Scope 3 Category 3 (fuel- and energy-related activities) only, market-based (2023 baseline 16,151)
water_dropWater
WUE
2 L/kWh
Operator-wide 2025 · Paris data centre only (reduced from 3.2)
flagTargets & commitments
Renewable target
Purchase 100% renewable electricity for Scope 2 by 2030
Operator-wide 2025 · global
SBTi
validated (SBTi-approved): reduce Scope 1+2 market-based and Scope 3 Cat.3 (FERA) emissions 42% by 2030 from 2023; 74% of capital-goods suppliers to set SBTs by 2029
Operator-wide 2025 · group
Climate Neutral DC Pact
yes
Operator-wide 2025 · EU; signed 30 Jun 2023
ISO 14001
ISO 14001 certified (with ISO 9001, 45001, 27001) - group-wide
Operator-wide 2025 · global
ISO 50001
ISO 50001 certified - group-wide
Operator-wide 2025 · global
Heat-reuse projects
Heat recovery agreement at Paris data centre - captured heat reused by local community infrastructure
Operator-wide 2025 · Paris
Backup fuel / HVO
Transitioning backup generation to HVO as near-term step
Operator-wide 2025 · group
Green bonds
700 million EUR green bond (2020, 1.375%, due 2030) EUR
Operator-wide 2025 · outstanding
business_centerBusiness
Data centers
8 data centres
Operator-wide 2025 · 7 cities: Amsterdam, Frankfurt, Hong Kong, London (2), Madrid, Paris, Singapore; gross floor area 410,499 m2
Operational capacity
252 MW saleable IT capacity
Operator-wide 2025 · group; 488 MVA utility power; 38.8 MW new signings in 2025
Countries
Netherlands, Germany, UK, Spain, France, Hong Kong SAR, Singapore; Johor (Malaysia) listed as location
Operator-wide 2026 · global
Revenue
466.2 million GBP GBP
Operator-wide 2025 · group (+6.8% vs 436.6m in 2024)
Headquarters
United Kingdom (London)
Operator-wide 2025
campaignNotable
Notable facts
C-suite and key operations remuneration linked to PUE KPIs; ~12% of GFA (47,696 m2) green-building certified; limited assurance on 2025 Scope 1-3; Australian business divested 2024; Scope 1+2 market-based emissions rose from 48,533 t (2023) to 71,227 t (2025) despite SBTi target
Operator-wide 2025 · group
mapFootprint
publicData centers by country
dnsData centers
17 · largest first| Data center | Status | Capacity | Building | PUE | Energy (est) | Networks |
|---|---|---|---|---|---|---|
| Global Switch London East London, GB | Operational | 87 MW | 6,235 m² | 1.2 | 582.7 GWh | 31 |
| Global Switch Hong Kong Tseung Kwan O, HK | Operational | 71 MW | 1,067 m² | — | 529.9 GWh | 9 |
| Global Switch London South London, GB | Operational | 70 MW | — | — | 522.4 GWh | — |
| Global Switch Madrid 2 Madrid, Madrid, ES | Operational | 56 MW | — | — | 418 GWh | — |
| Global Switch Amsterdam East Amsterdam, North Holland, NL | Operational | 32 MW | 30,371 m² | — | 206.3 GWh | 98 |
| Global Switch Paris North Clichy, Ile-de-France, FR | Operational | 24 MW | — | — | 179.1 GWh | — |
| Global Switch Singapore Woodlands Singapore, SG | Operational | 22 MW | — | — | 164.2 GWh | — |
| Global Switch London North London, GB | Operational | 18 MW | 7,507 m² | — | 153 GWh | 32 |
| Global Switch Paris South Clichy, Ile-de-France, FR | Operational | 18 MW | — | — | 134.3 GWh | — |
| Global Switch Singapore Tai Seng Singapore, SG | Operational | 17 MW | 4,630 m² | — | 125.8 GWh | 142 |
| Global Switch Paris West Clichy, Ile-de-France, FR | Operational | 17 MW | — | — | 126.9 GWh | — |
| Global Switch Frankfurt South Frankfurt, Hessen, DE | Operational | 10 MW | — | — | 74.6 GWh | — |
| Global Switch Madrid Madrid, ES | Operational | — | 5,149 m² | — | 148.9 GWh | 19 |
| Global Switch Paris Clichy, FR | Operational | — | 4,782 m² | — | 32.5 GWh | 31 |
| Global Switch Frankfurt Frankfurt, DE | Operational | — | 2,934 m² | — | 200.7 GWh | 17 |
| Global Switch Johor Kulai, Johor, MY | Planned / permitted | — | — | — | — | — |
| Global Switch Bangkok Bangkok, TH | Planned / permitted | — | — | — | — | — |
Global Switch · London, United Kingdom
Global Switch · Tseung Kwan O, Hong Kong
Global Switch · London, United Kingdom
Global Switch · Madrid, Spain
Global Switch · Amsterdam, Netherlands
Global Switch · Clichy, France
Global Switch · Singapore, Singapore
Global Switch · London, United Kingdom
Global Switch · Clichy, France
Global Switch · Singapore, Singapore
Global Switch · Clichy, France
Global Switch · Frankfurt, Germany
Global Switch Madrid
≈ 20 MW
Global Switch · Madrid, Spain
Global Switch Paris
≈ 4.3 MW
Global Switch · Clichy, France
Global Switch Frankfurt
≈ 27 MW
Global Switch · Frankfurt, Germany
Global Switch · Kulai, Malaysia
Global Switch · Bangkok, Thailand