9,339
Data centers
18.13 GW
Reported · 622 data centers
313.14 GW
Pipeline MW
318.86 TWh
Est. energy / yr
111.2 Mt
Est. CO₂ / yr
154
Countries

expand_lessStatus

Operational8,222
Under construction343
Planned / permitted677
Cancelled / closed97
hollow = approximate location
my_location
fit_screen
layers
arrow_backAll operators
corporate_fare

InterRacks data centers

No ownership data
Data centers
4
Countries
1
Reported MW
0 MW
Pipeline MW
0 MW
Building area
2,393 m²
Est. energy / yr
16.3 GWh
Est. CO₂ / yr
4.1 kt
Median PUE
—
No ESG profile collected for this operator yet.

mapFootprint

publicData centers by country

dnsData centers

4 · largest first
Data centerStatusCapacityBuildingPUEEnergy (est)Networks
InterDC Hengelo
Hengelo, Overijssel, NL
Operational—1,283 m²—8.7 GWh5
InterDC Doetinchem
Doetinchem, Gelderland, NL
Operational—792 m²—5.4 GWh22
InterDC Enschede
Enschede, Overijssel, NL
Operational—247 m²—1.7 GWh12
InterDC Enschede Marssteden
Enschede, Overijssel, NL
Operational—71 m²—482 MWh13
InterDC Hengelo
≈ 1.2 MW
InterRacks · Hengelo, Netherlands
Operational · Colocation · 1,283 m² · 5 networks
InterRacks · Doetinchem, Netherlands
Operational · Colocation · 792 m² · 22 networks
InterRacks · Enschede, Netherlands
Operational · Colocation · 247 m² · 12 networks
InterRacks · Enschede, Netherlands
Operational · Colocation · 71 m² · 13 networks