9,339
Data centers
18.13 GW
Reported · 622 data centers
313.14 GW
Pipeline MW
318.86 TWh
Est. energy / yr
111.2 Mt
Est. CO₂ / yr
154
Countries
expand_lessStatus
Operational8,222
Under construction343
Planned / permitted677
Cancelled / closed97
hollow = approximate location
my_location
fit_screen
layers
arrow_backAll operators
corporate_fare
OPCORE (Scaleway/iliad) data centers
iliad group (Scaleway 96% owned by iliad per Wikipedia; OPCORE carved out of Scaleway in 2023; InfraVia co-ownership reported but not verified this session) · private (iliad group / Xavier Niel; '100% European capital')
Data centers
6
Countries
1
Reported MW
0 MW
Pipeline MW
0 MW
Building area
41,583 m²
Est. energy / yr
555.7 GWh
Est. CO₂ / yr
22.5 kt
Median PUE
1.37
ecoSustainability — operator-wide
Hover a value for the quote from the reportboltEnergy
Renewable share
100 % (GoO-backed wind/hydro)
Operator-wide 2024 · Scaleway data centres (incl. OPCORE-operated DC2, DC3, DC5)
Renewable procurement
Direct long-term energy agreement with EDF for decarbonised nuclear power for all sites; claims exclusively renewable sourcing since 2018. Scaleway: 100% wind or hydro Guarantees of Origin at all DCs
Operator-wide 2025 · all OPCORE sites
Average PUE
1.37 PUE
Operator-wide 2024 · Scaleway average across hosting DCs (Paris, Amsterdam, Warsaw)
Best PUE
1.2 PUE
Operator-wide 2024 · Scaleway AMS3 (third-party); best OPCORE site DC5 = 1.25
Design PUE, new builds
<1.2 PUE
Operator-wide 2025 · all new OPCORE data centres (HDD technology)
water_dropWater
WUE
DC2 0.009; DC3 0.00009; DC4 0.00002; DC5 0.25; AMS1 1.64
Operator-wide 2024 · Scaleway-reported per DC
flagTargets & commitments
Net-zero target
Scaleway: -90% Scope 1, 2 & 3 by 2050 vs 2022
Operator-wide 2024 · Scaleway (cloud arm)
Climate Neutral DC Pact
Scaleway was an early signatory but listed as lapsed/departed (spun off as Opcore) in July 2023
Operator-wide 2023 · Scaleway/Opcore
ISO 50001
ISO 50001:2018 (plus ISO 27001:2022, HDS, Tier III design)
Operator-wide 2025 · OPCORE
business_centerBusiness
Data centers
7 data centres
Operator-wide 2025 · PAR1-PAR5, MRS1 Marseille, LYO1 Lyon (France; Poland also referenced)
Pipeline capacity
730 MW (contracted/under construction, Paris area)
Operator-wide 2026 · Ile-de-France, EUR 4bn investment
Headquarters
France
Operator-wide 2025 · Paris region
campaignNotable
Notable facts
Claims first operator in Europe with native direct liquid cooling; PAR3 first French Tier III certified DC (2015); Scaleway publishes real-time PUE since 2012; reconditioned ~15,000 servers and 12,000+ HDDs in 2024
Operator-wide 2026 · company
mapFootprint
publicData centers by country
dnsData centers
6 · largest first| Data center | Status | Capacity | Building | PUE | Energy (est) | Networks |
|---|---|---|---|---|---|---|
| OPCORE DC6-5 FR | Operational | — | 13,707 m² | 1.37 | 89.8 GWh | — |
| OPCORE - DC3 / PAR3 Vitry-sur-Seine, Val-de-Marne, FR | Operational | — | 9,892 m² | 1.36 | 120.8 GWh | 27 |
| OPCORE - DC5 / PAR5 Saint-Ouen-l'Aumône, Val-d'Oise, FR | Operational | — | 7,451 m² | 1.18 | 209.6 GWh | 5 |
| OPCORE DC1 FR | Operational | — | 6,540 m² | 1.48 | 57 GWh | — |
| OPCORE - DC2 / PAR2 Vitry-sur-Seine, Val-de-Marne, FR | Operational | — | 2,824 m² | 1.47 | 47.8 GWh | 44 |
| OPCORE - DC4 / PAR4 Paris, Paris, FR | Operational | — | 1,169 m² | 1.37 | 30.6 GWh | 1 |
OPCORE DC6-5
≈ 12 MW
OPCORE (Scaleway/iliad) · France
OPCORE - DC3 / PAR3
≈ 17 MW
OPCORE (Scaleway/iliad) · Vitry-sur-Seine, France
OPCORE - DC5 / PAR5
≈ 34 MW
OPCORE (Scaleway/iliad) · Saint-Ouen-l'Aumône, France
OPCORE DC1
≈ 7.3 MW
OPCORE (Scaleway/iliad) · France
OPCORE - DC2 / PAR2
≈ 6.2 MW
OPCORE (Scaleway/iliad) · Vitry-sur-Seine, France
OPCORE - DC4 / PAR4
≈ 4.3 MW
OPCORE (Scaleway/iliad) · Paris, France