STACK Infrastructure data centers
Blue Owl Capital (via IPI Partners funds) · private (infrastructure fund-owned; investor not named in the 2025 Impact Report)
Data centers
39
Countries
11
Reported MW
397 MW
Pipeline MW
4.32 GW
Building area
44,097 m²
Est. energy / yr
4.26 TWh
Est. CO₂ / yr
1.58 Mt
Median PUE
1.3
ecoSustainability — operator-wide
Hover a value for the quote from the reportboltEnergy
Data-center electricity
1.55 TWh
Operator-wide 2024 · total electricity consumption, global data centers
Renewable share
100%
Operator-wide 2024 · renewable electricity, global (1,550,679 MWh procured)
Renewable procurement
Renewable electricity procurement covering 1,550,679 MWh of 1,551,336 MWh consumed (instruments not itemized in extract)
Operator-wide 2024 · global
Average PUE
1.3
Operator-wide 2024 · operational PUE, portfolio (design PUE also 1.30)
Design PUE, new builds
1.3
Operator-wide 2024 · design PUE
cloudEmissions
Scope 1
3.1 ktCO₂e
Operator-wide 2024 · company-wide (refrigerants <1% of total emissions)
Scope 2 location-based
362.5 ktCO₂e
Operator-wide 2024 · company-wide
Scope 2 market-based
162 tCO₂e
Operator-wide 2024 · company-wide
Scope 3
296.3 ktCO₂e
Operator-wide 2024 · market-based (location-based Scope 3: 663,944)
water_dropWater
Water consumption
1.1 M m³
Operator-wide 2024 · total water consumption, global; converted from 289,962,906 US gallons (potable 247,119,458 gal; non-potable 42,843,449 gal)
WUE
1.32 L/kWh
Operator-wide 2024 · operational WUE, portfolio
recyclingWaste
Waste generated
2,039 t (converted from 2,248 short tons)
Operator-wide 2024 · operational waste
Waste diverted from landfill
52%
Operator-wide 2024 · operations (1,159 short tons diverted)
flagTargets & commitments
Net-zero target
2050
Operator-wide 2024 · operations and value chain
SBTi
SBTi targets: Scope 1+2 -50% and Scope 3 -61% by 2034 vs 2021 baseline; net zero 2050 (validation status not explicit in extract)
Operator-wide 2024 · company-wide
Climate Neutral DC Pact
yes
Operator-wide 2024 · EMEA
ISO 14001
18 sites ISO 14001 certified (also 15 ISO 45001, 7 LEED, 3 SA8000)
Operator-wide 2024 · global
ISO 50001
17 sites ISO 50001 certified
Operator-wide 2024 · global
Heat-reuse projects
Heat reuse systems standardized across many European sites (e.g., Oslo, Stockholm regions) supplying zero-carbon heat to local communities
Operator-wide 2024 · EMEA
Backup fuel / HVO
69,298 gallons of HVO/renewable diesel used in 2024
Operator-wide 2024 · global
Green bonds
~18 billion USD cumulative green financing; 8.97 billion USD green loans in 2024 (7 transactions, >2 GW, 6 countries) USD
Operator-wide 2024 · cumulative
business_centerBusiness
Data centers
100+ data centers active or under development
Operator-wide 2025 · global, as of 30 Sep 2025, 25 markets
Pipeline capacity
8.5+ GW built and under development; 7.5+ GW planned and potential
Operator-wide 2026 · global
Countries
US, Canada, Japan, Australia, Malaysia, Denmark, Germany, Switzerland, Italy, Sweden, Norway (24-25 markets in 3 regions)
Operator-wide 2026 · global
Employees
908 employees (908+)
Operator-wide 2025 · global
campaignNotable
Notable facts
LCAs required for all new builds; 11 beehives on European campuses; STACK Academy launched Apr 2025; 100% activity-based data for Scope 1+2
Operator-wide 2025 · global
mapFootprint
publicData centers by country
dnsData centers
39 · largest first| Data center | Status | Capacity | Building | PUE | Energy (est) | Networks |
|---|---|---|---|---|---|---|
| Stafford Technology Campus Falmouth, VA, US | Planned / permitted | 1.1 GW | — | 1.3 | — | — |
| Stargate Project Jupiter Santa Teresa, NM, US | Under construction | 1 GW | — | 1.3 | — | — |
| STACK Infrastructure Goldendale Data Center Goldendale, WA, US | Planned / permitted | 958 MW | — | 1.3 | — | — |
| STACK DFW02 (Lancaster) Lancaster, TX, US | Under construction | 500 MW | — | 1.3 | — | — |
| STACK Infrastructure PHX02 Campus Phoenix, AZ, US | Under construction | 250 MW | — | 1.3 | — | — |
| STACK Infrastructure PHX01 Campus Avondale, AZ, US | Operational | 225 MW | — | 1.3 | 246 GWh | — |
| STACK NVA Loudoun 144MW Hyperscale Campus Ashburn, VA, US | Planned / permitted | 144 MW | — | 1.3 | — | — |
| Stack Infrastructure Silicon Valley SVY01 San Jose, CA, US | Operational | 90 MW | — | 1.3 | 246 GWh | 1 |
| STACK DFW01 (Plano) Plano, TX, US | Operational | 80 MW | — | 1.3 | 546.6 GWh | — |
| STACK Hillsboro Campus Hillsboro, OR, US | Planned / permitted | 75 MW | — | 1.3 | — | — |
| Stack Infrastructure - POR03 Hillsboro, OR, US | Operational | 72 MW | — | 1.3 | 492 GWh | — |
| STACK SVY03A Hayward, CA, US | Under construction | 67 MW | — | 1.3 | — | — |
| STACK Infrastructure NAL01 (New Albany) New Albany, OH, US | Operational | 60 MW | — | 1.3 | 410 GWh | — |
| STACK SVY02 CA, US | Operational | 48 MW | — | 1.3 | 328 GWh | — |
| STACK Chicago CHI01 Elk Grove Village, IL, US | Operational | 40 MW | — | 1.3 | 273.3 GWh | — |
| Stack Infrastructure - POR01 Hillsboro, OR, US | Operational | 36 MW | — | 1.3 | 246 GWh | — |
| Stack Infrastructure - POR02 Hillsboro, OR, US | Operational | 24 MW | — | 1.3 | 164 GWh | 9 |
| STACK ATL01 (former T5@Atlanta) Alpharetta, GA, US | Operational | 20 MW | — | 1.3 | 136.7 GWh | — |
| STACK NVA01A - Northern Virginia VA, US | Operational | 17 MW | — | 1.3 | 116.2 GWh | — |
| STACK MIL01A IT | Operational | — | 12,987 m² | 1.3 | 80.8 GWh | — |
| STACK infrastructure ZUR01 Rafz, Zürich, CH | Operational | — | 9,551 m² | 1.3 | 59.4 GWh | 0 |
| Stack Infrastructure MEL01A AU | Operational | — | 7,701 m² | 1.3 | 573.8 GWh | — |
| STACK Infrastructure data center (Beringen) Beringen, CH | Under construction | — | 6,617 m² | 1.3 | — | — |
| Stack Infrastructure OSLO1A NO | Operational | — | 4,076 m² | 1.3 | 71 GWh | — |
| STACK Infrastructure OSL04 NO | Operational | — | 3,165 m² | 1.3 | 19.7 GWh | — |
| STACK infrastructure GEN02 Gland, VD, CH | Operational | — | — | 1.3 | 246 GWh | 6 |
| Berry Hill / Southern Virginia Megasite Berry Hill, VA, US | Planned / permitted | — | — | 1.3 | — | — |
| Bossier Parish Campus (with Amazon) Benton, LA, US | Under construction | — | — | 1.3 | — | — |
| Caddo Parish Campus (with Amazon) Blanchard, LA, US | Under construction | — | — | 1.3 | — | — |
| STACK Calgary Calgary, AB, CA | Operational | — | — | 1.3 | — | — |
| STACK NVA04 campus (22275-22295 Lockridge Rd) Sterling, VA, US | Operational | — | — | 1.3 | — | — |
| STACK Toronto Toronto, ON, CA | Operational | — | — | 1.3 | — | — |
| STACK Johor Bahru Johor Bahru, MY | Under construction | — | — | 1.3 | — | — |
| STACK Osaka Osaka, JP | Operational | — | — | 1.3 | — | — |
| STACK Sydney Sydney, AU | Operational | — | — | 1.3 | — | — |
| STACK Tokyo Tokyo, JP | Operational | — | — | 1.3 | — | — |
| STACK Copenhagen Copenhagen, DK | Operational | — | — | 1.3 | — | — |
| STACK Frankfurt Frankfurt, DE | Operational | — | — | 1.3 | — | — |
| STACK Stockholm Stockholm, SE | Operational | — | — | 1.3 | — | — |
STACK Infrastructure · Falmouth, United States
STACK Infrastructure · Santa Teresa, United States
STACK Infrastructure · Goldendale, United States
STACK DFW02 (Lancaster)
500 MW
STACK Infrastructure · Lancaster, United States
STACK Infrastructure · Phoenix, United States
STACK Infrastructure · Avondale, United States
STACK Infrastructure · Ashburn, United States
STACK Infrastructure · San Jose, United States
STACK DFW01 (Plano)
80 MW
STACK Infrastructure · Plano, United States
STACK Infrastructure · Hillsboro, United States
STACK Infrastructure · Hillsboro, United States
STACK SVY03A
67 MW
STACK Infrastructure · Hayward, United States
STACK Infrastructure · New Albany, United States
STACK SVY02
48 MW
STACK Infrastructure · United States
STACK Chicago CHI01
40 MW
STACK Infrastructure · Elk Grove Village, United States
STACK Infrastructure · Hillsboro, United States
STACK Infrastructure · Hillsboro, United States
STACK Infrastructure · Alpharetta, United States
STACK Infrastructure · United States
STACK MIL01A
≈ 12 MW
STACK Infrastructure · Italy
STACK infrastructure ZUR01
≈ 8.7 MW
STACK Infrastructure · Rafz, Switzerland
Stack Infrastructure MEL01A
≈ 84 MW
STACK Infrastructure · Australia
STACK Infrastructure · Beringen, Switzerland
Stack Infrastructure OSLO1A
≈ 10 MW
STACK Infrastructure · Norway
STACK Infrastructure OSL04
≈ 2.9 MW
STACK Infrastructure · Norway
STACK Infrastructure · Gland, Switzerland
STACK Infrastructure · Berry Hill, United States
STACK Infrastructure · Benton, United States
STACK Infrastructure · Blanchard, United States
STACK Infrastructure · Calgary, Canada
STACK Infrastructure · Sterling, United States
STACK Infrastructure · Toronto, Canada
STACK Infrastructure · Johor Bahru, Malaysia
STACK Infrastructure · Osaka, Japan
STACK Infrastructure · Sydney, Australia
STACK Infrastructure · Tokyo, Japan
STACK Infrastructure · Copenhagen, Denmark
STACK Infrastructure · Frankfurt, Germany
STACK Infrastructure · Stockholm, Sweden