9,339
Data centers
18.13 GW
Reported · 622 data centers
313.14 GW
Pipeline MW
318.86 TWh
Est. energy / yr
111.2 Mt
Est. CO₂ / yr
154
Countries

expand_lessStatus

Operational8,222
Under construction343
Planned / permitted677
Cancelled / closed97
hollow = approximate location
my_location
fit_screen
layers
arrow_backAll operators
corporate_fare

Switch (Switch Inc.) data centers

DigitalBridge-led consortium (taken private 2022) — UNVERIFIED background; datacentermap still shows former NYSE:SWCH listing · private (formerly NYSE:SWCH) — current owners not verified this session
Data centers
19
Countries
1
Reported MW
1.12 GW
Pipeline MW
680 MW
Building area
16,201 m²
Est. energy / yr
8.58 TWh
Est. CO₂ / yr
3.29 Mt
Median PUE
—

ecoSustainability — operator-wide

Hover a value for the quote from the report
boltEnergy
Renewable share
100 % renewable power (as offered)
Operator-wide 2025 · Las Vegas CORE campus (up to 275 MW)
flagTargets & commitments
Green bonds
Debt facility expanded to USD 9.5 billion for AI data center expansion (June 2026); green designation not stated
Operator-wide 2026 · company
business_centerBusiness
Data centers
42-47 data centers (directory counts: datacentermap 42; baxtel meta 47)
Operator-wide 2025 · USA (Las Vegas, Tahoe Reno, Grand Rapids, Atlanta, Austin, Houston; Pittsburgh planned)
Headquarters
United States (Las Vegas, Nevada)
Operator-wide 2025 · company
campaignNotable
Notable facts
Founder/CEO Rob Roy holds 500+ issued and pending patent claims on data center designs; campuses: CORE (Las Vegas), CITADEL (Tahoe Reno), PYRAMID (Grand Rapids), KEEP (Atlanta); Austin (Round Rock) and Houston builds; +133% power growth since 2022 (baxtel)
Operator-wide 2026 · company

mapFootprint

publicData centers by country

dnsData centers

19 · largest first
Data centerStatusCapacityBuildingPUEEnergy (est)Networks
Switch Citadel Campus
Tahoe Reno, US
Operational650 MW——4.85 TWh—
Switch CITADEL Campus
McCarran, NV, US
Operational250 MW——1.87 TWh7
Switch Pyramid Campus
Gaines Township, MI, US
Operational225 MW——1.68 TWh—
Switch: The Rock
Round Rock, TX, US
Under construction185 MW16,201 m²———
Switch Las Vegas 12
Las Vegas, NV, US
Operational———10.5 GWh47
Switch Atlanta: The Keep
Lithia Springs, GA, US
Operational———6.3 GWh—
Switch Edge 1
NV, US
Operational———10.5 GWh—
Switch Las Vegas 10
Las Vegas, NV, US
Operational———10.5 GWh—
Switch Las Vegas 14
Las Vegas, NV, US
Operational———6.3 GWh—
Switch Las Vegas 4
Las Vegas, NV, US
Operational———6.3 GWh—
Switch Las Vegas 9
Las Vegas, NV, US
Operational———6.3 GWh—
Tahoe Reno 2
McCarran, NV, US
Operational———6.3 GWh—
Tahoe Reno 5
McCarran, NV, US
Operational———6.3 GWh—
Switch Apex Industrial Park Land Position
North Las Vegas, NV, US
Planned / permitted—————
Big Beaver Campus
Big Beaver, PA, US
Planned / permitted—————
Switch KEEP 2.0 Atlanta North Campus
Cartersville, GA, US
Planned / permitted—————
Switch LAS 19
Enterprise, NV, US
Planned / permitted—————
Switch Las Vegas 11
Las Vegas, NV, US
Operational———104.5 GWh—
Switch Las Vegas 15
Las Vegas, NV, US
Operational———6.3 GWh—
Switch (Switch Inc.) · Tahoe Reno, United States
Operational · Colocation · opened 2017
Switch (Switch Inc.) · McCarran, United States
Operational · Colocation · 7 networks
Switch (Switch Inc.) · Gaines Township, United States
Operational · Colocation · opened 2017
Switch (Switch Inc.) · Round Rock, United States
Under construction · Colocation · 16,201 m² · opened 2025
Switch (Switch Inc.) · Las Vegas, United States
Operational · Enterprise · 47 networks · opened 2008
Switch (Switch Inc.) · Lithia Springs, United States
Operational · Colocation
Switch (Switch Inc.) · United States
Operational · Enterprise
Switch (Switch Inc.) · Las Vegas, United States
Operational · Enterprise
Switch (Switch Inc.) · Las Vegas, United States
Operational · Colocation
Switch (Switch Inc.) · Las Vegas, United States
Operational · Colocation
Switch (Switch Inc.) · Las Vegas, United States
Operational · Colocation
Switch (Switch Inc.) · McCarran, United States
Operational · Colocation
Switch (Switch Inc.) · McCarran, United States
Operational · Colocation
Switch (Switch Inc.) · North Las Vegas, United States
Planned / permitted · HPC / AI
Switch (Switch Inc.) · Big Beaver, United States
Planned / permitted · Colocation
Switch (Switch Inc.) · Cartersville, United States
Planned / permitted · Colocation
Switch (Switch Inc.) · Enterprise, United States
Planned / permitted · Colocation
Switch (Switch Inc.) · Las Vegas, United States
Operational · HPC / AI
Switch (Switch Inc.) · Las Vegas, United States
Operational · Colocation