Telstra data centers

none · listed ASX (TLS) — ticker background, not sourced
Data centers
8
Countries
5
Reported MW
0 MW
Pipeline MW
0 MW
Building area
40,016 m²
Est. energy / yr
375.6 GWh
Est. CO₂ / yr
193.4 kt
Median PUE
1.62

ecoSustainability — operator-wide

Hover a value for the quote from the report
boltEnergy
Renewable share
100 % (renewable generation enabled vs consumption)
Operator-wide 2025 · group, as at Dec 2025 — generation-equivalent, not delivered-share; reported as 121% (renewable purchases above consumption) — capped at 100%
Renewable procurement
Long-term power purchase agreements supporting renewable generation (MW and projects not extracted)
Operator-wide 2026 · group
cloudEmissions
Scope 1
37.8 ktCO₂e
Operator-wide 2024 · Australian operations FY24 (from CDP risk discussion)
recyclingWaste
Waste diverted from landfill
94%
Operator-wide 2026 · network waste recycling rate FY26
E-waste
621 t ('over')
Operator-wide 2026 · legacy network infrastructure recovered for recycling across 306 sites
flagTargets & commitments
Net-zero target
2050
Operator-wide 2026 · group GHG; interim: -70% absolute Scope 1+2 and -50% Scope 3 by 2030 vs FY19
Renewable target
Enable renewable generation equivalent to 100% of consumption by 2025 (achieved 121% by end CY2025)
Operator-wide 2026 · group
SBTi
validated — net-zero target validated by SBTi; progress FY26: Scope 1+2 -48%, Scope 3 -49% vs FY19
Operator-wide 2026 · group
CDP climate score
A-
Operator-wide 2026 · group
business_centerBusiness
Revenue
A$22,937m total revenue (excl. finance income)
Operator-wide 2026 · group FY26
Headquarters
Australia
Operator-wide 2026 · company
campaignNotable
Controversies
Major network outage on 8 July 2026; Federal Court ordered A$18m penalty plus A$300k costs for upload-speed misrepresentation; a Field Services worker died during FY26
Operator-wide 2026 · group
Notable facts
Australian electricity use down ~30% and water down 18% since FY19; A$22.2m invested in energy reduction in FY26; InfraCo project for Viasat includes 300 satellite ground stations at Telstra sites and 13 data centre upgrades
Operator-wide 2026 · group

mapFootprint

publicData centers by country

dnsData centers

8 · largest first
Data centerStatusCapacityBuildingPUEEnergy (est)Networks
Telstra
AU
Operational—20,083 m²—136.4 GWh—
Telstra InfraCo - St Leonards Data Centre
St Leonards, NSW, AU
Operational—10,719 m²1.6182.5 GWh2
Telstra InfraCo - Clayton Data Centre
Clayton, VIC, AU
Operational—4,324 m²1.62116.8 GWh1
London Hosting Centre
London, GB
Operational—3,340 m²—6.3 GWh30
Pacnet HK DLS
Tseung Kwan O, HK
Operational—1,550 m²—21.1 GWh3
Telstra PBS Tianjin TJCS1
Tianjin, CN
Operational————3
Pacnet SEDS1
Seoul, KR
Operational———6.3 GWh0
Telstra
AU
Operational———6.3 GWh—
Telstra
≈ 18 MW
Telstra · Australia
Operational · Colocation · 20,083 m²
Telstra · St Leonards, Australia
Operational · Colocation · 10,719 m² · 2 networks
Telstra · Clayton, Australia
Operational · Colocation · 4,324 m² · 1 networks
Telstra · London, United Kingdom
Operational · Colocation · 3,340 m² · 30 networks
Pacnet HK DLS
≈ 2.8 MW
Telstra · Tseung Kwan O, Hong Kong
Operational · Colocation · 1,550 m² · 3 networks
Telstra · Tianjin, China
Operational · Colocation · 3 networks
Telstra · Seoul, South Korea
Operational · Colocation
Telstra · Australia
Operational · Colocation