Telstra data centers
none · listed ASX (TLS) — ticker background, not sourced
Data centers
8
Countries
5
Reported MW
0 MW
Pipeline MW
0 MW
Building area
40,016 m²
Est. energy / yr
375.6 GWh
Est. CO₂ / yr
193.4 kt
Median PUE
1.62
ecoSustainability — operator-wide
Hover a value for the quote from the reportboltEnergy
Renewable share
100 % (renewable generation enabled vs consumption)
Operator-wide 2025 · group, as at Dec 2025 — generation-equivalent, not delivered-share; reported as 121% (renewable purchases above consumption) — capped at 100%
Renewable procurement
Long-term power purchase agreements supporting renewable generation (MW and projects not extracted)
Operator-wide 2026 · group
cloudEmissions
Scope 1
37.8 ktCO₂e
Operator-wide 2024 · Australian operations FY24 (from CDP risk discussion)
recyclingWaste
Waste diverted from landfill
94%
Operator-wide 2026 · network waste recycling rate FY26
E-waste
621 t ('over')
Operator-wide 2026 · legacy network infrastructure recovered for recycling across 306 sites
flagTargets & commitments
Net-zero target
2050
Operator-wide 2026 · group GHG; interim: -70% absolute Scope 1+2 and -50% Scope 3 by 2030 vs FY19
Renewable target
Enable renewable generation equivalent to 100% of consumption by 2025 (achieved 121% by end CY2025)
Operator-wide 2026 · group
SBTi
validated — net-zero target validated by SBTi; progress FY26: Scope 1+2 -48%, Scope 3 -49% vs FY19
Operator-wide 2026 · group
CDP climate score
A-
Operator-wide 2026 · group
business_centerBusiness
Revenue
A$22,937m total revenue (excl. finance income)
Operator-wide 2026 · group FY26
Headquarters
Australia
Operator-wide 2026 · company
campaignNotable
Controversies
Major network outage on 8 July 2026; Federal Court ordered A$18m penalty plus A$300k costs for upload-speed misrepresentation; a Field Services worker died during FY26
Operator-wide 2026 · group
Notable facts
Australian electricity use down ~30% and water down 18% since FY19; A$22.2m invested in energy reduction in FY26; InfraCo project for Viasat includes 300 satellite ground stations at Telstra sites and 13 data centre upgrades
Operator-wide 2026 · group
mapFootprint
publicData centers by country
dnsData centers
8 · largest first| Data center | Status | Capacity | Building | PUE | Energy (est) | Networks |
|---|---|---|---|---|---|---|
| Telstra AU | Operational | — | 20,083 m² | — | 136.4 GWh | — |
| Telstra InfraCo - St Leonards Data Centre St Leonards, NSW, AU | Operational | — | 10,719 m² | 1.61 | 82.5 GWh | 2 |
| Telstra InfraCo - Clayton Data Centre Clayton, VIC, AU | Operational | — | 4,324 m² | 1.62 | 116.8 GWh | 1 |
| London Hosting Centre London, GB | Operational | — | 3,340 m² | — | 6.3 GWh | 30 |
| Pacnet HK DLS Tseung Kwan O, HK | Operational | — | 1,550 m² | — | 21.1 GWh | 3 |
| Telstra PBS Tianjin TJCS1 Tianjin, CN | Operational | — | — | — | — | 3 |
| Pacnet SEDS1 Seoul, KR | Operational | — | — | — | 6.3 GWh | 0 |
| Telstra AU | Operational | — | — | — | 6.3 GWh | — |
Telstra
≈ 18 MW
Telstra · Australia
Telstra · St Leonards, Australia
Telstra · Clayton, Australia
Telstra · London, United Kingdom
Pacnet HK DLS
≈ 2.8 MW
Telstra · Tseung Kwan O, Hong Kong
Telstra · Tianjin, China
Telstra · Seoul, South Korea
Telstra · Australia